Inspection of ongoing work of NH-56

Inspected the ongoing construction work of four laning of Babatpur Airport to Varanasi City Road (NH-56). Total length of the project is 17.250 km out of which 70% work has been completed. Also inspected the major structures of this highway – ROB cum Viaduct & Flyover.